Energy Performance Certificate

18, Poplar Street, Haslingden, BB4 5LY

EPC Report

Energy rating

Current: 15 G | Potential: 72 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 15 G Current: 15 G 72 C Potential: 72 C

Environmental impact (CO₂)

Current: 21 | Potential: 70
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 21 Current: 21 70 Potential: 70
Field Value
LMK KEY 8062-7023-0980-5079-9992
ADDRESS1 18, Poplar Street
ADDRESS2 Haslingden
ADDRESS3
POSTCODE BB4 5LY
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING G
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 15
POTENTIAL ENERGY EFFICIENCY 72
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2012-07-11
LOCAL AUTHORITY E07000125
CONSTITUENCY E14001299
COUNTY
LODGEMENT DATE 2012-07-12
TRANSACTION TYPE marketed sale
ENVIRONMENT IMPACT CURRENT 21
ENVIRONMENT IMPACT POTENTIAL 70
ENERGY CONSUMPTION CURRENT 587
ENERGY CONSUMPTION POTENTIAL 165
CO2 EMISSIONS CURRENT 11
CO2 EMISS CURR PER FLOOR AREA 110
CO2 EMISSIONS POTENTIAL 3.1
LIGHTING COST CURRENT 89
LIGHTING COST POTENTIAL 52
HEATING COST CURRENT 1516
HEATING COST POTENTIAL 758
HOT WATER COST CURRENT 669
HOT WATER COST POTENTIAL 70
TOTAL FLOOR AREA 97
ENERGY TARIFF Single
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS No thermostatic control of room temperature
MULTI GLAZE PROPORTION 10
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 27
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Very Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Some double glazing
WINDOWS ENERGY EFF Very Poor
WINDOWS ENV EFF Very Poor
WALLS DESCRIPTION Sandstone, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Room heaters, mains gas
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION No thermostatic control of room temperature
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 27% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.9
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 18, Poplar Street, Haslingden
LOCAL AUTHORITY LABEL Rossendale
CONSTITUENCY LABEL Hyndburn
POSTTOWN ROSSENDALE
CONSTRUCTION AGE BAND England and Wales: before 1900
LODGEMENT DATETIME 2012-07-12 16:27:41
TENURE
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 100010613776
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2012.csv
COUNTRY England
REGION E12000002
Address display
Nation ew