Energy Performance Certificate

11, Tintern Road, B20 3HJ

EPC Report

Energy rating

Current: 58 D | Potential: 85 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 58 D Current: 58 D 85 B Potential: 85 B

Environmental impact (CO₂)

Current: 51 | Potential: 83
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 51 Current: 51 83 Potential: 83
Field Value
LMK KEY 8000-7791-3929-6427-1663
ADDRESS1 11, Tintern Road
ADDRESS2
ADDRESS3
POSTCODE B20 3HJ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 58
POTENTIAL ENERGY EFFICIENCY 85
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2016-06-21
LOCAL AUTHORITY E08000025
CONSTITUENCY E14001098
COUNTY
LODGEMENT DATE 2016-06-22
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 51
ENVIRONMENT IMPACT POTENTIAL 83
ENERGY CONSUMPTION CURRENT 316
ENERGY CONSUMPTION POTENTIAL 98
CO2 EMISSIONS CURRENT 4.2
CO2 EMISS CURR PER FLOOR AREA 56
CO2 EMISSIONS POTENTIAL 1.4
LIGHTING COST CURRENT 77
LIGHTING COST POTENTIAL 51
HEATING COST CURRENT 782
HEATING COST POTENTIAL 450
HOT WATER COST CURRENT 120
HOT WATER COST POTENTIAL 70
TOTAL FLOOR AREA 76
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 50
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 50% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.97
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 11, Tintern Road
LOCAL AUTHORITY LABEL Birmingham
CONSTITUENCY LABEL Birmingham Perry Barr
POSTTOWN BIRMINGHAM
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2016-06-22 09:43:45
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 10
LOW ENERGY FIXED LIGHT COUNT 5
UPRN 100070540745
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000005
Address display
Nation ew