Energy Performance Certificate

12 Ambassador House, 219 Queensway, Bletchley, MK2 2FE

EPC Report

Energy rating

Current: 84 B | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 84 B Current: 84 B 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 87 | Potential: 87
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 87 Current: 87 87 Potential: 87
Field Value
LMK KEY 7500-3977-0422-1108-3523
ADDRESS1 12 Ambassador House
ADDRESS2 219 Queensway
ADDRESS3 Bletchley
POSTCODE MK2 2FE
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING B
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 84
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2022-05-03
LOCAL AUTHORITY E06000042
CONSTITUENCY E14001141
COUNTY
LODGEMENT DATE 2022-05-03
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 87
ENVIRONMENT IMPACT POTENTIAL 87
ENERGY CONSUMPTION CURRENT 89
ENERGY CONSUMPTION POTENTIAL 89
CO2 EMISSIONS CURRENT 1.0
CO2 EMISS CURR PER FLOOR AREA 16
CO2 EMISSIONS POTENTIAL 1.0
LIGHTING COST CURRENT 60
LIGHTING COST POTENTIAL 60
HEATING COST CURRENT 121
HEATING COST POTENTIAL 121
HOT WATER COST CURRENT 103
HOT WATER COST POTENTIAL 103
TOTAL FLOOR AREA 61
ENERGY TARIFF Unknown
MAINS GAS FLAG N
FLOOR LEVEL 2
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Flat rate charging, programmer and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Community scheme
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION System built, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Community scheme
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Flat rate charging, programmer and TRVs
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR heated corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.31
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 12 Ambassador House, 219 Queensway, Bletchley
LOCAL AUTHORITY LABEL Milton Keynes
CONSTITUENCY LABEL Buckingham and Bletchley
POSTTOWN MILTON KEYNES
CONSTRUCTION AGE BAND England and Wales: 2007-2011
LODGEMENT DATETIME 2022-05-03 09:54:24
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 8
LOW ENERGY FIXED LIGHT COUNT 8
UPRN 10090356677
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY England
REGION E12000008
Address display
Nation ew