Energy Performance Certificate

FLAT 319, DENISON HOUSE, 20 LANTERNS WAY, E14 9JG

EPC Report

Energy rating

Current: 83 B | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 83 B Current: 83 B 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 84 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 84 Current: 84 85 Potential: 85
Field Value
LMK KEY 7005-0699-7002-0127-0802
ADDRESS1 FLAT 319
ADDRESS2 DENISON HOUSE
ADDRESS3 20 LANTERNS WAY
POSTCODE E14 9JG
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING B
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 83
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2021-03-20
LOCAL AUTHORITY E09000030
CONSTITUENCY E14001430
COUNTY
LODGEMENT DATE 2021-03-22
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 84
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 83
ENERGY CONSUMPTION POTENTIAL 78
CO2 EMISSIONS CURRENT 1.6
CO2 EMISS CURR PER FLOOR AREA 14
CO2 EMISSIONS POTENTIAL 1.5
LIGHTING COST CURRENT 127
LIGHTING COST POTENTIAL 88
HEATING COST CURRENT 183
HEATING COST POTENTIAL 188
HOT WATER COST CURRENT 121
HOT WATER COST POTENTIAL 121
TOTAL FLOOR AREA 109
ENERGY TARIFF Unknown
MAINS GAS FLAG Y
FLOOR LEVEL 2
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Charging system linked to use of community heating, room thermostat only
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 57
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Community scheme
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION System built, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Community scheme
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Charging system linked to use of community heating, room thermostat only
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 57% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 6.6
FLOOR HEIGHT 2.4
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS FLAT 319, DENISON HOUSE, 20 LANTERNS WAY
LOCAL AUTHORITY LABEL Tower Hamlets
CONSTITUENCY LABEL Poplar and Limehouse
POSTTOWN LONDON
CONSTRUCTION AGE BAND England and Wales: 2007-2011
LODGEMENT DATETIME 2021-03-22 20:30:47
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 30
LOW ENERGY FIXED LIGHT COUNT 17
UPRN 6170785
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY England
REGION E12000007
Address display
Nation ew