Energy Performance Certificate

Wayside, Coast Road, Mostyn, CH8 9HF

EPC Report

Energy rating

Current: 13 G | Potential: 59 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 13 G Current: 13 G 59 D Potential: 59 D

Environmental impact (CO₂)

Current: 46 | Potential: 79
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 46 Current: 46 79 Potential: 79
Field Value
LMK KEY 5790-4002-1622-3394-0023
ADDRESS1 Wayside
ADDRESS2 Coast Road
ADDRESS3 Mostyn
POSTCODE CH8 9HF
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING G
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 13
POTENTIAL ENERGY EFFICIENCY 59
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2022-10-10
LOCAL AUTHORITY W06000005
CONSTITUENCY W07000094
COUNTY
LODGEMENT DATE 2022-10-28
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 46
ENVIRONMENT IMPACT POTENTIAL 79
ENERGY CONSUMPTION CURRENT 237
ENERGY CONSUMPTION POTENTIAL 84
CO2 EMISSIONS CURRENT 9.1
CO2 EMISS CURR PER FLOOR AREA 52
CO2 EMISSIONS POTENTIAL 3.4
LIGHTING COST CURRENT 115
LIGHTING COST POTENTIAL 115
HEATING COST CURRENT 3787
HEATING COST POTENTIAL 1688
HOT WATER COST CURRENT 327
HOT WATER COST POTENTIAL 211
TOTAL FLOOR AREA 175
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 0
GLAZED TYPE not defined
GLAZED AREA Much More Than Typical
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 8
NUMBER HEATED ROOMS 8
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Granite or whinstone, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, bottled LPG
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL bottled LPG
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.3
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Wayside, Coast Road, Mostyn
LOCAL AUTHORITY LABEL Flintshire
CONSTITUENCY LABEL Clwyd East
POSTTOWN HOLYWELL
CONSTRUCTION AGE BAND England and Wales: before 1900
LODGEMENT DATETIME 2022-10-28 09:47:11
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 20
LOW ENERGY FIXED LIGHT COUNT 20
UPRN 10013706245
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY Wales
REGION W99999999
Address display
Nation ew