Energy Performance Certificate

113 Skyline Plaza, Alencon Link, RG21 7AQ

EPC Report

Energy rating

Current: 79 C | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 79 C Current: 79 C 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 95 | Potential: 95
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 95 Current: 95 95 Potential: 95
Field Value
LMK KEY 5535-1126-2500-0145-2222
ADDRESS1 113 Skyline Plaza
ADDRESS2 Alencon Link
ADDRESS3
POSTCODE RG21 7AQ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 79
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE Flat
BUILT FORM Not Recorded
INSPECTION DATE 2025-06-25
LOCAL AUTHORITY E07000084
CONSTITUENCY E14001078
COUNTY
LODGEMENT DATE 2025-09-13
TRANSACTION TYPE Stock condition survey
ENVIRONMENT IMPACT CURRENT 95
ENVIRONMENT IMPACT POTENTIAL 95
ENERGY CONSUMPTION CURRENT 110
ENERGY CONSUMPTION POTENTIAL 109
CO2 EMISSIONS CURRENT 0.2
CO2 EMISS CURR PER FLOOR AREA 11
CO2 EMISSIONS POTENTIAL 0.2
LIGHTING COST CURRENT 23
LIGHTING COST POTENTIAL 24
HEATING COST CURRENT 273
HEATING COST POTENTIAL 139
HOT WATER COST CURRENT 263
HOT WATER COST POTENTIAL 273
TOTAL FLOOR AREA 23
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL 2
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Appliance thermostats
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 1
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES
HOTWATER DESCRIPTION Electric instantaneous at point of use
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Very Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION System built, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Room heaters, electric
MAINHEAT ENERGY EFF Poor
MAINHEAT ENV EFF Very Good
MAINHEATCONT DESCRIPTION Appliance thermostats
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Good lighting efficiency
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR heated corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.34
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 113 Skyline Plaza, Alencon Link
LOCAL AUTHORITY LABEL Basingstoke and Deane
CONSTITUENCY LABEL Basingstoke
POSTTOWN BASINGSTOKE
CONSTRUCTION AGE BAND England and Wales: 2003-2006
LODGEMENT DATETIME 2025-09-13 17:15:41
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 6
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 10008491382
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY England
REGION E12000008
Address display
Nation ew