Energy Performance Certificate

22 Third Street, Blackhall Colliery, TS27 4EW

EPC Report

Energy rating

Current: 11 G | Potential: 86 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 11 G Current: 11 G 86 B Potential: 86 B

Environmental impact (CO₂)

Current: 25 | Potential: 84
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 25 Current: 25 84 Potential: 84
Field Value
LMK KEY 5490-0740-0822-6208-3243
ADDRESS1 22 Third Street
ADDRESS2 Blackhall Colliery
ADDRESS3
POSTCODE TS27 4EW
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING G
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 11
POTENTIAL ENERGY EFFICIENCY 86
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2024-12-04
LOCAL AUTHORITY E06000047
CONSTITUENCY E14001211
COUNTY
LODGEMENT DATE 2024-12-04
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 25
ENVIRONMENT IMPACT POTENTIAL 84
ENERGY CONSUMPTION CURRENT 716
ENERGY CONSUMPTION POTENTIAL 117
CO2 EMISSIONS CURRENT 8.3
CO2 EMISS CURR PER FLOOR AREA 121
CO2 EMISSIONS POTENTIAL 1.5
LIGHTING COST CURRENT 131
LIGHTING COST POTENTIAL 77
HEATING COST CURRENT 3049
HEATING COST POTENTIAL 642
HOT WATER COST CURRENT 832
HOT WATER COST POTENTIAL 93
TOTAL FLOOR AREA 69
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS None
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 0
LOW ENERGY LIGHTING 29
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION No system present: electric immersion assumed
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION No system present: electric heaters assumed
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION None
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 29% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL To be used only when there is no heating/hot-water system or data is from a community network
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.3
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 22 Third Street, Blackhall Colliery
LOCAL AUTHORITY LABEL County Durham
CONSTITUENCY LABEL Easington
POSTTOWN HARTLEPOOL
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2024-12-04 21:55:59
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 2
UPRN 100110440458
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2024.csv
COUNTRY England
REGION E12000001
Address display
Nation ew