Energy Performance Certificate

Second Floor Flat, 10 Clyde Park, Redland, BS6 6RR

EPC Report

Energy rating

Current: 72 C | Potential: 74 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 72 C Current: 72 C 74 C Potential: 74 C

Environmental impact (CO₂)

Current: 73 | Potential: 76
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 73 Current: 73 76 Potential: 76
Field Value
LMK KEY 5232-5722-9209-0787-2296
ADDRESS1 Second Floor Flat
ADDRESS2 10 Clyde Park
ADDRESS3 Redland
POSTCODE BS6 6RR
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 72
POTENTIAL ENERGY EFFICIENCY 74
PROPERTY TYPE Flat
BUILT FORM Detached
INSPECTION DATE 2022-12-13
LOCAL AUTHORITY E06000023
CONSTITUENCY E14001131
COUNTY
LODGEMENT DATE 2022-12-19
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 73
ENVIRONMENT IMPACT POTENTIAL 76
ENERGY CONSUMPTION CURRENT 213
ENERGY CONSUMPTION POTENTIAL 190
CO2 EMISSIONS CURRENT 1.7
CO2 EMISS CURR PER FLOOR AREA 38
CO2 EMISSIONS POTENTIAL 1.5
LIGHTING COST CURRENT 43
LIGHTING COST POTENTIAL 43
HEATING COST CURRENT 301
HEATING COST POTENTIAL 280
HOT WATER COST CURRENT 82
HOT WATER COST POTENTIAL 71
TOTAL FLOOR AREA 44
ENERGY TARIFF Unknown
MAINS GAS FLAG Y
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 2
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Timber frame, with additional insulation
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, insulated at rafters
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 4.45
FLOOR HEIGHT 2.2
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Second Floor Flat, 10 Clyde Park, Redland
LOCAL AUTHORITY LABEL Bristol, City of
CONSTITUENCY LABEL Bristol Central
POSTTOWN BRISTOL
CONSTRUCTION AGE BAND England and Wales: before 1900
LODGEMENT DATETIME 2022-12-19 17:25:28
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 234683
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY England
REGION E12000009
Address display
Nation ew