Energy Performance Certificate

Room 2, 3 Cobham close, SM6 9DS

EPC Report

Energy rating

Current: 38 F | Potential: 42 E
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 38 F Current: 38 F 42 E Potential: 42 E

Environmental impact (CO₂)

Current: 79 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 79 Current: 79 85 Potential: 85
Field Value
LMK KEY 4536-4524-9100-0111-1222
ADDRESS1 Room 2
ADDRESS2 3 Cobham close
ADDRESS3
POSTCODE SM6 9DS
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING E
CURRENT ENERGY EFFICIENCY 38
POTENTIAL ENERGY EFFICIENCY 42
PROPERTY TYPE Flat
BUILT FORM Not Recorded
INSPECTION DATE 2026-04-29
LOCAL AUTHORITY E09000029
CONSTITUENCY E14001153
COUNTY
LODGEMENT DATE 2026-05-04
TRANSACTION TYPE Stock condition survey
ENVIRONMENT IMPACT CURRENT 79
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 597
ENERGY CONSUMPTION POTENTIAL 486
CO2 EMISSIONS CURRENT 0.8
CO2 EMISS CURR PER FLOOR AREA 70
CO2 EMISSIONS POTENTIAL 0.5
LIGHTING COST CURRENT 15
LIGHTING COST POTENTIAL 15
HEATING COST CURRENT 201
HEATING COST POTENTIAL 139
HOT WATER COST CURRENT 842
HOT WATER COST POTENTIAL 842
TOTAL FLOOR AREA 11
ENERGY TARIFF Unknown
MAINS GAS FLAG Y
FLOOR LEVEL 1
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Flat rate charging, TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 1
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES
HOTWATER DESCRIPTION No system present: electric immersion assumed
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Very Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Community scheme
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Flat rate charging, TRVs
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Good lighting efficiency
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.43
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Room 2, 3 Cobham close
LOCAL AUTHORITY LABEL Sutton
CONSTITUENCY LABEL Carshalton and Wallington
POSTTOWN London
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2026-05-04 12:31:41
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 2
LOW ENERGY FIXED LIGHT COUNT 2
UPRN
UPRN SOURCE
REPORT TYPE 2
Source file certificates-2026.csv
COUNTRY England
REGION E12000007
Address display
Nation ew