Energy Performance Certificate

41 ORION WAY, BRAINTREE, CM7 9UR

EPC Report

Energy rating

Current: 63 D | Potential: 86 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 63 D Current: 63 D 86 B Potential: 86 B

Environmental impact (CO₂)

Current: 59 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 Current: 59 85 Potential: 85
Field Value
LMK KEY 3990-7010-0322-3003-1903
ADDRESS1 41 ORION WAY
ADDRESS2 BRAINTREE
ADDRESS3
POSTCODE CM7 9UR
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 63
POTENTIAL ENERGY EFFICIENCY 86
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2020-11-09
LOCAL AUTHORITY E07000067
CONSTITUENCY E14001121
COUNTY
LODGEMENT DATE 2020-11-09
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 59
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 279
ENERGY CONSUMPTION POTENTIAL 91
CO2 EMISSIONS CURRENT 3.3
CO2 EMISS CURR PER FLOOR AREA 49
CO2 EMISSIONS POTENTIAL 1.1
LIGHTING COST CURRENT 118
LIGHTING COST POTENTIAL 63
HEATING COST CURRENT 523
HEATING COST POTENTIAL 390
HOT WATER COST CURRENT 144
HOT WATER COST POTENTIAL 76
TOTAL FLOOR AREA 68
ENERGY TARIFF dual
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 13
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, partial insulation (assumed)
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 13% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.33
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 41 ORION WAY, BRAINTREE
LOCAL AUTHORITY LABEL Braintree
CONSTITUENCY LABEL Braintree
POSTTOWN BRAINTREE
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2020-11-09 18:02:36
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 8
LOW ENERGY FIXED LIGHT COUNT 1
UPRN 100090303315
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2020.csv
COUNTRY England
REGION E12000006
Address display
Nation ew