Energy Performance Certificate

High Barn, Byfleet Road, KT11 1EA

EPC Report

Energy rating

Current: 58 D | Potential: 83 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 58 D Current: 58 D 83 B Potential: 83 B

Environmental impact (CO₂)

Current: 57 | Potential: 81
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 57 Current: 57 81 Potential: 81
Field Value
LMK KEY 3334-7529-0409-0868-4222
ADDRESS1 High Barn
ADDRESS2 Byfleet Road
ADDRESS3
POSTCODE KT11 1EA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 58
POTENTIAL ENERGY EFFICIENCY 83
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2024-11-28
LOCAL AUTHORITY E07000207
CONSTITUENCY E14001456
COUNTY
LODGEMENT DATE 2024-11-28
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 57
ENVIRONMENT IMPACT POTENTIAL 81
ENERGY CONSUMPTION CURRENT 225
ENERGY CONSUMPTION POTENTIAL 95
CO2 EMISSIONS CURRENT 8.3
CO2 EMISS CURR PER FLOOR AREA 33
CO2 EMISSIONS POTENTIAL 3.2
LIGHTING COST CURRENT 199
LIGHTING COST POTENTIAL 199
HEATING COST CURRENT 2935
HEATING COST POTENTIAL 2029
HOT WATER COST CURRENT 210
HOT WATER COST POTENTIAL 211
TOTAL FLOOR AREA 250
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 81
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 9
NUMBER HEATED ROOMS 9
LOW ENERGY LIGHTING 85
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Mostly double glazing
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, wood logs
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 85% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.41
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS High Barn, Byfleet Road
LOCAL AUTHORITY LABEL Elmbridge
CONSTITUENCY LABEL Runnymede and Weybridge
POSTTOWN COBHAM
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2024-11-28 12:09:31
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 80
LOW ENERGY FIXED LIGHT COUNT 68
UPRN 100061307366
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2024.csv
COUNTRY England
REGION E12000008
Address display
Nation ew