Energy Performance Certificate

7 Carr Lane East, L11 4SE

EPC Report

Energy rating

Current: 82 B | Potential: 85 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 82 B Current: 82 B 85 B Potential: 85 B

Environmental impact (CO₂)

Current: 81 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 81 Current: 81 85 Potential: 85
Field Value
LMK KEY 2901-9161-1810-0801-5847
ADDRESS1 7 Carr Lane East
ADDRESS2
ADDRESS3
POSTCODE L11 4SE
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING B
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 82
POTENTIAL ENERGY EFFICIENCY 85
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2025-01-16
LOCAL AUTHORITY E08000012
CONSTITUENCY E14001339
COUNTY
LODGEMENT DATE 2025-01-20
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 81
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 103
ENERGY CONSUMPTION POTENTIAL 80
CO2 EMISSIONS CURRENT 1.9
CO2 EMISS CURR PER FLOOR AREA 18
CO2 EMISSIONS POTENTIAL 1.5
LIGHTING COST CURRENT 155
LIGHTING COST POTENTIAL 107
HEATING COST CURRENT 761
HEATING COST POTENTIAL 719
HOT WATER COST CURRENT 132
HOT WATER COST POTENTIAL 88
TOTAL FLOOR AREA 104
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE not defined
GLAZED AREA Much More Than Typical
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 6
LOW ENERGY LIGHTING 55
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 400+ mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 55% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.44
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 7 Carr Lane East
LOCAL AUTHORITY LABEL Liverpool
CONSTITUENCY LABEL Liverpool Walton
POSTTOWN LIVERPOOL
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2025-01-20 21:20:50
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 38027771
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY England
REGION E12000002
Address display
Nation ew