Energy Performance Certificate

63 Eyhurst Avenue, RM12 4RB

EPC Report

Energy rating

Current: 42 E | Potential: 78 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 42 E Current: 42 E 78 C Potential: 78 C

Environmental impact (CO₂)

Current: 37 | Potential: 68
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 37 Current: 37 68 Potential: 68
Field Value
LMK KEY 2815-9195-2002-0393-2206
ADDRESS1 63 Eyhurst Avenue
ADDRESS2
ADDRESS3
POSTCODE RM12 4RB
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 42
POTENTIAL ENERGY EFFICIENCY 78
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2025-07-18
LOCAL AUTHORITY E09000016
CONSTITUENCY E14001189
COUNTY
LODGEMENT DATE 2025-07-19
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 37
ENVIRONMENT IMPACT POTENTIAL 68
ENERGY CONSUMPTION CURRENT 368
ENERGY CONSUMPTION POTENTIAL 157
CO2 EMISSIONS CURRENT 6.3
CO2 EMISS CURR PER FLOOR AREA 67
CO2 EMISSIONS POTENTIAL 2.7
LIGHTING COST CURRENT 121
LIGHTING COST POTENTIAL 72
HEATING COST CURRENT 1614
HEATING COST POTENTIAL 830
HOT WATER COST CURRENT 459
HOT WATER COST POTENTIAL 227
TOTAL FLOOR AREA 93
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 45
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 75 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Below average lighting efficiency
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.45
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 63 Eyhurst Avenue
LOCAL AUTHORITY LABEL Havering
CONSTITUENCY LABEL Dagenham and Rainham
POSTTOWN HORNCHURCH
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2025-07-19 08:57:41
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 42
LOW ENERGY FIXED LIGHT COUNT 19
UPRN 100021329225
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY England
REGION E12000007
Address display
Nation ew