Energy Performance Certificate

53 FFORDD PENNANT, MELIDEN, PRESTATYN, LL19 8PE

EPC Report

Energy rating

Current: 66 D | Potential: 80 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 66 D Current: 66 D 80 C Potential: 80 C

Environmental impact (CO₂)

Current: 64 | Potential: 78
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 64 Current: 64 78 Potential: 78
Field Value
LMK KEY 2783-3900-7200-3590-3200
ADDRESS1 53 FFORDD PENNANT
ADDRESS2 MELIDEN, PRESTATYN
ADDRESS3
POSTCODE LL19 8PE
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 66
POTENTIAL ENERGY EFFICIENCY 80
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2020-10-28
LOCAL AUTHORITY W06000004
CONSTITUENCY W07000094
COUNTY
LODGEMENT DATE 2020-11-01
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 64
ENVIRONMENT IMPACT POTENTIAL 78
ENERGY CONSUMPTION CURRENT 223
ENERGY CONSUMPTION POTENTIAL 128
CO2 EMISSIONS CURRENT 3.3
CO2 EMISS CURR PER FLOOR AREA 39
CO2 EMISSIONS POTENTIAL 1.9
LIGHTING COST CURRENT 69
LIGHTING COST POTENTIAL 69
HEATING COST CURRENT 658
HEATING COST POTENTIAL 607
HOT WATER COST CURRENT 106
HOT WATER COST POTENTIAL 73
TOTAL FLOOR AREA 85
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.43
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 53 FFORDD PENNANT, MELIDEN, PRESTATYN
LOCAL AUTHORITY LABEL Denbighshire
CONSTITUENCY LABEL Clwyd East
POSTTOWN PRESTATYN
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2020-11-01 18:09:27
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 8
LOW ENERGY FIXED LIGHT COUNT 8
UPRN
UPRN SOURCE
REPORT TYPE 2
Source file certificates-2020.csv
COUNTRY Wales
REGION W99999999
Address display
Nation ew