Energy Performance Certificate

90, Westhead Road, Croston, PR26 9RS

EPC Report

Energy rating

Current: 62 D | Potential: 81 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 62 D Current: 62 D 81 B Potential: 81 B

Environmental impact (CO₂)

Current: 54 | Potential: 77
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 54 Current: 54 77 Potential: 77
Field Value
LMK KEY 2748-1026-7204-0077-4970
ADDRESS1 90, Westhead Road
ADDRESS2 Croston
ADDRESS3
POSTCODE PR26 9RS
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 62
POTENTIAL ENERGY EFFICIENCY 81
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2013-04-24
LOCAL AUTHORITY E07000118
CONSTITUENCY E14001491
COUNTY
LODGEMENT DATE 2013-01-25
TRANSACTION TYPE FiT application
ENVIRONMENT IMPACT CURRENT 54
ENVIRONMENT IMPACT POTENTIAL 77
ENERGY CONSUMPTION CURRENT 200
ENERGY CONSUMPTION POTENTIAL 99
CO2 EMISSIONS CURRENT 10
CO2 EMISS CURR PER FLOOR AREA 39
CO2 EMISSIONS POTENTIAL 5.2
LIGHTING COST CURRENT 123
LIGHTING COST POTENTIAL 91
HEATING COST CURRENT 1767
HEATING COST POTENTIAL 1104
HOT WATER COST CURRENT 110
HOT WATER COST POTENTIAL 97
TOTAL FLOOR AREA 266
ENERGY TARIFF Single
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 10
NUMBER HEATED ROOMS 10
LOW ENERGY LIGHTING 65
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 75 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 65% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.83
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 90, Westhead Road, Croston
LOCAL AUTHORITY LABEL Chorley
CONSTITUENCY LABEL South Ribble
POSTTOWN LEYLAND
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2013-04-25 15:35:25
TENURE Owner-occupied
FIXED LIGHTING OUTLETS COUNT 34
LOW ENERGY FIXED LIGHT COUNT 22
UPRN 100012757902
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2013.csv
COUNTRY England
REGION E12000002
Address display
Nation ew