Energy Performance Certificate

79 Four Seasons Park, Chapel St. Leonards, PE24 5YZ

EPC Report

Energy rating

Current: 36 F | Potential: 68 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 36 F Current: 36 F 68 D Potential: 68 D

Environmental impact (CO₂)

Current: 32 | Potential: 66
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 32 Current: 32 66 Potential: 66
Field Value
LMK KEY 2560-7161-4198-3679-9163
ADDRESS1 79 Four Seasons Park
ADDRESS2 Chapel St. Leonards
ADDRESS3
POSTCODE PE24 5YZ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 36
POTENTIAL ENERGY EFFICIENCY 68
PROPERTY TYPE Park home
BUILT FORM Detached
INSPECTION DATE 2022-06-22
LOCAL AUTHORITY E07000137
CONSTITUENCY E14001114
COUNTY
LODGEMENT DATE 2022-06-24
TRANSACTION TYPE Assessment for Green Deal
ENVIRONMENT IMPACT CURRENT 32
ENVIRONMENT IMPACT POTENTIAL 66
ENERGY CONSUMPTION CURRENT 602
ENERGY CONSUMPTION POTENTIAL 254
CO2 EMISSIONS CURRENT 6.1
CO2 EMISS CURR PER FLOOR AREA 103
CO2 EMISSIONS POTENTIAL 2.6
LIGHTING COST CURRENT 115
LIGHTING COST POTENTIAL 53
HEATING COST CURRENT 1285
HEATING COST POTENTIAL 464
HOT WATER COST CURRENT 90
HOT WATER COST POTENTIAL 79
TOTAL FLOOR AREA 59
ENERGY TARIFF dual
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE not defined
GLAZED AREA Much More Than Typical
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 0
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, limited insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Park home wall, as built
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, limited insulation (assumed)
ROOF ENERGY EFF Poor
ROOF ENV EFF Poor
MAINHEAT DESCRIPTION Electric storage heaters, Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION No low energy lighting
LIGHTING ENERGY EFF Very Poor
LIGHTING ENV EFF Very Poor
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.3
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 79 Four Seasons Park, Chapel St. Leonards
LOCAL AUTHORITY LABEL East Lindsey
CONSTITUENCY LABEL Boston and Skegness
POSTTOWN SKEGNESS
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2022-06-24 07:21:46
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 12
LOW ENERGY FIXED LIGHT COUNT 0
UPRN 10008520763
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY England
REGION E12000004
Address display
Nation ew