Energy Performance Certificate

3, Falcon Square, Castle Hedingham, CO9 3BT

EPC Report

Energy rating

Current: 58 D | Potential: 79 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 58 D Current: 58 D 79 C Potential: 79 C

Environmental impact (CO₂)

Current: 59 | Potential: 81
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 Current: 59 81 Potential: 81
Field Value
LMK KEY 2448-6090-7278-0612-2900
ADDRESS1 3, Falcon Square
ADDRESS2 Castle Hedingham
ADDRESS3
POSTCODE CO9 3BT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 58
POTENTIAL ENERGY EFFICIENCY 79
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2012-08-24
LOCAL AUTHORITY E07000067
CONSTITUENCY E14001121
COUNTY
LODGEMENT DATE 2012-08-24
TRANSACTION TYPE marketed sale
ENVIRONMENT IMPACT CURRENT 59
ENVIRONMENT IMPACT POTENTIAL 81
ENERGY CONSUMPTION CURRENT 227
ENERGY CONSUMPTION POTENTIAL 112
CO2 EMISSIONS CURRENT 6.8
CO2 EMISS CURR PER FLOOR AREA 37
CO2 EMISSIONS POTENTIAL 3.1
LIGHTING COST CURRENT 152
LIGHTING COST POTENTIAL 78
HEATING COST CURRENT 1263
HEATING COST POTENTIAL 814
HOT WATER COST CURRENT 188
HOT WATER COST POTENTIAL 147
TOTAL FLOOR AREA 183
ENERGY TARIFF dual
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 0
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 9
NUMBER HEATED ROOMS 9
LOW ENERGY LIGHTING 6
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Single glazed
WINDOWS ENERGY EFF Very Poor
WINDOWS ENV EFF Very Poor
WALLS DESCRIPTION Timber frame, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, wood logs
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 50 mm loft insulation
ROOF ENERGY EFF Poor
ROOF ENV EFF Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 6% of fixed outlets
LIGHTING ENERGY EFF Very Poor
LIGHTING ENV EFF Very Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 1
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 3, Falcon Square, Castle Hedingham
LOCAL AUTHORITY LABEL Braintree
CONSTITUENCY LABEL Braintree
POSTTOWN HALSTEAD
CONSTRUCTION AGE BAND England and Wales: before 1900
LODGEMENT DATETIME 2012-08-24 15:18:29
TENURE
FIXED LIGHTING OUTLETS COUNT 17
LOW ENERGY FIXED LIGHT COUNT 1
UPRN 100090316575
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2012.csv
COUNTRY England
REGION E12000006
Address display
Nation ew