Energy Performance Certificate

109 Bow Road, E3 2AN

EPC Report

Energy rating

Current: 59 D | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 D Current: 59 D 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 48 | Potential: 77
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 48 Current: 48 77 Potential: 77
Field Value
LMK KEY 2249-0060-4204-5402-7204
ADDRESS1 109 Bow Road
ADDRESS2
ADDRESS3
POSTCODE E3 2AN
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 59
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2022-04-24
LOCAL AUTHORITY E09000030
CONSTITUENCY E14001525
COUNTY
LODGEMENT DATE 2022-04-25
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 48
ENVIRONMENT IMPACT POTENTIAL 77
ENERGY CONSUMPTION CURRENT 227
ENERGY CONSUMPTION POTENTIAL 88
CO2 EMISSIONS CURRENT 8.6
CO2 EMISS CURR PER FLOOR AREA 40
CO2 EMISSIONS POTENTIAL 3.4
LIGHTING COST CURRENT 122
LIGHTING COST POTENTIAL 124
HEATING COST CURRENT 1348
HEATING COST POTENTIAL 703
HOT WATER COST CURRENT 157
HOT WATER COST POTENTIAL 81
TOTAL FLOOR AREA 215
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 4
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 50
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 6
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Partial double glazing
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Roof room(s), no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.7
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 109 Bow Road
LOCAL AUTHORITY LABEL Tower Hamlets
CONSTITUENCY LABEL Stratford and Bow
POSTTOWN LONDON
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2022-04-25 02:06:00
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 30
LOW ENERGY FIXED LIGHT COUNT 30
UPRN 6070549
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY England
REGION E12000007
Address display
Nation ew