Energy Performance Certificate

9 Cooper Close, Caister-On-Sea, NR30 5EN

EPC Report

Energy rating

Current: 65 D | Potential: 85 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 65 D Current: 65 D 85 B Potential: 85 B

Environmental impact (CO₂)

Current: 60 | Potential: 83
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 60 Current: 60 83 Potential: 83
Field Value
LMK KEY 2234-3041-5208-6524-3200
ADDRESS1 9 Cooper Close
ADDRESS2 Caister-On-Sea
ADDRESS3
POSTCODE NR30 5EN
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 65
POTENTIAL ENERGY EFFICIENCY 85
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2024-08-27
LOCAL AUTHORITY E07000145
CONSTITUENCY E14001256
COUNTY
LODGEMENT DATE 2024-08-27
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 60
ENVIRONMENT IMPACT POTENTIAL 83
ENERGY CONSUMPTION CURRENT 248
ENERGY CONSUMPTION POTENTIAL 92
CO2 EMISSIONS CURRENT 3.9
CO2 EMISS CURR PER FLOOR AREA 44
CO2 EMISSIONS POTENTIAL 1.5
LIGHTING COST CURRENT 146
LIGHTING COST POTENTIAL 109
HEATING COST CURRENT 1025
HEATING COST POTENTIAL 791
HOT WATER COST CURRENT 349
HOT WATER COST POTENTIAL 132
TOTAL FLOOR AREA 90
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 67
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 67% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.4
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 9 Cooper Close, Caister-On-Sea
LOCAL AUTHORITY LABEL Great Yarmouth
CONSTITUENCY LABEL Great Yarmouth
POSTTOWN GREAT YARMOUTH
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2024-08-27 17:20:14
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 100090838164
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2024.csv
COUNTRY England
REGION E12000006
Address display
Nation ew