Energy Performance Certificate

3 FFORDD FFYNNON, PRESTATYN, LL19 8BA

EPC Report

Energy rating

Current: 62 D | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 62 D Current: 62 D 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 54 | Potential: 79
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 54 Current: 54 79 Potential: 79
Field Value
LMK KEY 2194-5519-9129-6731-1061
ADDRESS1 3 FFORDD FFYNNON
ADDRESS2 PRESTATYN
ADDRESS3
POSTCODE LL19 8BA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 62
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE Bungalow
BUILT FORM Detached
INSPECTION DATE 2021-03-08
LOCAL AUTHORITY W06000004
CONSTITUENCY W07000094
COUNTY
LODGEMENT DATE 2021-03-09
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 54
ENVIRONMENT IMPACT POTENTIAL 79
ENERGY CONSUMPTION CURRENT 273
ENERGY CONSUMPTION POTENTIAL 118
CO2 EMISSIONS CURRENT 4.6
CO2 EMISS CURR PER FLOOR AREA 48
CO2 EMISSIONS POTENTIAL 2
LIGHTING COST CURRENT 92
LIGHTING COST POTENTIAL 92
HEATING COST CURRENT 768
HEATING COST POTENTIAL 534
HOT WATER COST CURRENT 122
HOT WATER COST POTENTIAL 70
TOTAL FLOOR AREA 96
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 77
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 50 mm loft insulation
ROOF ENERGY EFF Poor
ROOF ENV EFF Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 77% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.5
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 3 FFORDD FFYNNON, PRESTATYN
LOCAL AUTHORITY LABEL Denbighshire
CONSTITUENCY LABEL Clwyd East
POSTTOWN PRESTATYN
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2021-03-09 15:59:40
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 13
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 100100188799
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY Wales
REGION W99999999
Address display
Nation ew