Energy Performance Certificate

Old Post Office, The Cross, Clearwell, GL16 8JT

EPC Report

Energy rating

Current: 61 D | Potential: 78 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 61 D Current: 61 D 78 C Potential: 78 C

Environmental impact (CO₂)

Current: 56 | Potential: 74
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 56 Current: 56 74 Potential: 74
Field Value
LMK KEY 2142-3040-8203-3504-3204
ADDRESS1 Old Post Office
ADDRESS2 The Cross
ADDRESS3 Clearwell
POSTCODE GL16 8JT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 61
POTENTIAL ENERGY EFFICIENCY 78
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2024-07-24
LOCAL AUTHORITY E07000080
CONSTITUENCY E14001240
COUNTY
LODGEMENT DATE 2024-07-29
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 56
ENVIRONMENT IMPACT POTENTIAL 74
ENERGY CONSUMPTION CURRENT 191
ENERGY CONSUMPTION POTENTIAL 101
CO2 EMISSIONS CURRENT 6.5
CO2 EMISS CURR PER FLOOR AREA 45
CO2 EMISSIONS POTENTIAL 3.8
LIGHTING COST CURRENT 146
LIGHTING COST POTENTIAL 146
HEATING COST CURRENT 1465
HEATING COST POTENTIAL 1034
HOT WATER COST CURRENT 305
HOT WATER COST POTENTIAL 248
TOTAL FLOOR AREA 144
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 6
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Sandstone or limestone, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, wood logs
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, oil
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL oil (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.2
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Old Post Office, The Cross, Clearwell
LOCAL AUTHORITY LABEL Forest of Dean
CONSTITUENCY LABEL Forest of Dean
POSTTOWN COLEFORD
CONSTRUCTION AGE BAND England and Wales: before 1900
LODGEMENT DATETIME 2024-07-29 06:30:23
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 13
LOW ENERGY FIXED LIGHT COUNT 13
UPRN 100120452785
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2024.csv
COUNTRY England
REGION E12000009
Address display
Nation ew