Energy Performance Certificate

9 Badger Way, Ewshot, GU10 5TE

EPC Report

Energy rating

Current: 75 C | Potential: 79 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 75 C Current: 75 C 79 C Potential: 79 C

Environmental impact (CO₂)

Current: 74 | Potential: 80
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 74 Current: 74 80 Potential: 80
Field Value
LMK KEY 2117-7875-2311-3116-4512
ADDRESS1 9 Badger Way
ADDRESS2 Ewshot
ADDRESS3
POSTCODE GU10 5TE
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 75
POTENTIAL ENERGY EFFICIENCY 79
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2023-11-08
LOCAL AUTHORITY E07000089
CONSTITUENCY E14001392
COUNTY
LODGEMENT DATE 2023-11-14
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 74
ENVIRONMENT IMPACT POTENTIAL 80
ENERGY CONSUMPTION CURRENT 142
ENERGY CONSUMPTION POTENTIAL 113
CO2 EMISSIONS CURRENT 4.6
CO2 EMISS CURR PER FLOOR AREA 20
CO2 EMISSIONS POTENTIAL 3.6
LIGHTING COST CURRENT 231
LIGHTING COST POTENTIAL 231
HEATING COST CURRENT 3147
HEATING COST POTENTIAL 2749
HOT WATER COST CURRENT 381
HOT WATER COST POTENTIAL 215
TOTAL FLOOR AREA 227
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA More Than Typical
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 9
NUMBER HEATED ROOMS 9
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, wood logs
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.39
PHOTO SUPPLY 20
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 9 Badger Way, Ewshot
LOCAL AUTHORITY LABEL Hart
CONSTITUENCY LABEL North East Hampshire
POSTTOWN FARNHAM
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2023-11-14 12:55:19
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 56
LOW ENERGY FIXED LIGHT COUNT 56
UPRN 100060417759
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2023.csv
COUNTRY England
REGION E12000008
Address display
Nation ew