Energy Performance Certificate

82 PETER KENNEDY COURT, 180 ORCHARD WAY, CROYDON, CR0 7LX

EPC Report

Energy rating

Current: 77 C | Potential: 77 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 77 C Current: 77 C 77 C Potential: 77 C

Environmental impact (CO₂)

Current: 79 | Potential: 79
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 79 Current: 79 79 Potential: 79
Field Value
LMK KEY 1500-3575-0122-2091-3493
ADDRESS1 82 PETER KENNEDY COURT
ADDRESS2 180 ORCHARD WAY
ADDRESS3 CROYDON
POSTCODE CR0 7LX
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 77
POTENTIAL ENERGY EFFICIENCY 77
PROPERTY TYPE Flat
BUILT FORM End-Terrace
INSPECTION DATE 2021-04-13
LOCAL AUTHORITY E09000008
CONSTITUENCY E14001186
COUNTY
LODGEMENT DATE 2021-04-13
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 79
ENVIRONMENT IMPACT POTENTIAL 79
ENERGY CONSUMPTION CURRENT 173
ENERGY CONSUMPTION POTENTIAL 173
CO2 EMISSIONS CURRENT 1.3
CO2 EMISS CURR PER FLOOR AREA 30
CO2 EMISSIONS POTENTIAL 1.3
LIGHTING COST CURRENT 46
LIGHTING COST POTENTIAL 46
HEATING COST CURRENT 189
HEATING COST POTENTIAL 189
HOT WATER COST CURRENT 97
HOT WATER COST POTENTIAL 97
TOTAL FLOOR AREA 41
ENERGY TARIFF Unknown
MAINS GAS FLAG N
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Flat rate charging, TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 2
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 80
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Community scheme
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Community scheme
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Flat rate charging, TRVs
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 80% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR heated corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.38
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 82 PETER KENNEDY COURT, 180 ORCHARD WAY, CROYDON
LOCAL AUTHORITY LABEL Croydon
CONSTITUENCY LABEL Croydon East
POSTTOWN CROYDON
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2021-04-13 14:24:06
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 5
LOW ENERGY FIXED LIGHT COUNT 4
UPRN 100020616221
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY England
REGION E12000007
Address display
Nation ew