Energy Performance Certificate

158 Ridyard Street, Little Hulton, M38 9WA

EPC Report

Energy rating

Current: 73 C | Potential: 79 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 73 C Current: 73 C 79 C Potential: 79 C

Environmental impact (CO₂)

Current: 73 | Potential: 76
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 73 Current: 73 76 Potential: 76
Field Value
LMK KEY 1036-2522-8100-0131-0202
ADDRESS1 158 Ridyard Street
ADDRESS2 Little Hulton
ADDRESS3
POSTCODE M38 9WA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 73
POTENTIAL ENERGY EFFICIENCY 79
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2026-02-09
LOCAL AUTHORITY E08000006
CONSTITUENCY E14001111
COUNTY
LODGEMENT DATE 2026-02-09
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 73
ENVIRONMENT IMPACT POTENTIAL 76
ENERGY CONSUMPTION CURRENT 166
ENERGY CONSUMPTION POTENTIAL 141
CO2 EMISSIONS CURRENT 2.6
CO2 EMISS CURR PER FLOOR AREA 30
CO2 EMISSIONS POTENTIAL 2.3
LIGHTING COST CURRENT 81
LIGHTING COST POTENTIAL 81
HEATING COST CURRENT 759
HEATING COST POTENTIAL 700
HOT WATER COST CURRENT 166
HOT WATER COST POTENTIAL 166
TOTAL FLOOR AREA 85
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 71
NUMBER OPEN FIREPLACES
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Below average lighting efficiency
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.41
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 158 Ridyard Street, Little Hulton
LOCAL AUTHORITY LABEL Salford
CONSTITUENCY LABEL Bolton South and Walkden
POSTTOWN MANCHESTER
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2026-02-09 14:40:54
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 14
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 100011385094
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2026.csv
COUNTRY England
REGION E12000002
Address display
Nation ew