Energy Performance Certificate

98, Royal Park Road, LS6 1JJ

EPC Report

Energy rating

Current: 46 E | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 46 E Current: 46 E 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 39 | Potential: 82
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 39 Current: 39 82 Potential: 82
Field Value
LMK KEY 0963-2829-6566-9921-4185
ADDRESS1 98, Royal Park Road
ADDRESS2
ADDRESS3
POSTCODE LS6 1JJ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 46
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2019-06-21
LOCAL AUTHORITY E08000035
CONSTITUENCY E14001319
COUNTY
LODGEMENT DATE 2019-06-22
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 39
ENVIRONMENT IMPACT POTENTIAL 82
ENERGY CONSUMPTION CURRENT 438
ENERGY CONSUMPTION POTENTIAL 122
CO2 EMISSIONS CURRENT 6.1
CO2 EMISS CURR PER FLOOR AREA 77
CO2 EMISSIONS POTENTIAL 1.7
LIGHTING COST CURRENT 79
LIGHTING COST POTENTIAL 58
HEATING COST CURRENT 1069
HEATING COST POTENTIAL 476
HOT WATER COST CURRENT 102
HOT WATER COST POTENTIAL 70
TOTAL FLOOR AREA 79
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 0
GLAZED TYPE not defined
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 64
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION To unheated space, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Single glazed
WINDOWS ENERGY EFF Very Poor
WINDOWS ENV EFF Very Poor
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 64% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.76
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 98, Royal Park Road
LOCAL AUTHORITY LABEL Leeds
CONSTITUENCY LABEL Leeds Central and Headingley
POSTTOWN LEEDS
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2019-06-22 11:59:01
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 72175807
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000003
Address display
Nation ew