Energy Performance Certificate

16, Broadway, Bower Hinton, TA12 6LP

EPC Report

Energy rating

Current: 51 E | Potential: 80 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 51 E Current: 51 E 80 C Potential: 80 C

Environmental impact (CO₂)

Current: 45 | Potential: 74
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 45 Current: 45 74 Potential: 74
Field Value
LMK KEY 0920-2817-7733-9908-8855
ADDRESS1 16, Broadway
ADDRESS2 Bower Hinton
ADDRESS3
POSTCODE TA12 6LP
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 51
POTENTIAL ENERGY EFFICIENCY 80
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2018-07-03
LOCAL AUTHORITY E06000066
CONSTITUENCY E14001247
COUNTY
LODGEMENT DATE 2018-07-16
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 45
ENVIRONMENT IMPACT POTENTIAL 74
ENERGY CONSUMPTION CURRENT 244
ENERGY CONSUMPTION POTENTIAL 81
CO2 EMISSIONS CURRENT 4.9
CO2 EMISS CURR PER FLOOR AREA 60
CO2 EMISSIONS POTENTIAL 2.0
LIGHTING COST CURRENT 78
LIGHTING COST POTENTIAL 57
HEATING COST CURRENT 541
HEATING COST POTENTIAL 364
HOT WATER COST CURRENT 144
HOT WATER COST POTENTIAL 71
TOTAL FLOOR AREA 82
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and at least two room thermostats
MULTI GLAZE PROPORTION 10
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 62
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Some double glazing
WINDOWS ENERGY EFF Very Poor
WINDOWS ENV EFF Very Poor
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 150 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, oil
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and at least two room thermostats
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 62% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL oil (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.35
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 16, Broadway, Bower Hinton
LOCAL AUTHORITY LABEL Somerset
CONSTITUENCY LABEL Glastonbury and Somerton
POSTTOWN MARTOCK
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2018-07-16 12:44:36
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 16
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 30050052
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2018.csv
COUNTRY England
REGION E12000009
Address display
Nation ew