Energy Performance Certificate

44, Montreal Road, IG1 4SH

EPC Report

Energy rating

Current: 65 D | Potential: 85 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 65 D Current: 65 D 85 B Potential: 85 B

Environmental impact (CO₂)

Current: 60 | Potential: 83
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 60 Current: 60 83 Potential: 83
Field Value
LMK KEY 0871-2881-6526-9291-7435
ADDRESS1 44, Montreal Road
ADDRESS2
ADDRESS3
POSTCODE IG1 4SH
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 65
POTENTIAL ENERGY EFFICIENCY 85
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2019-02-19
LOCAL AUTHORITY E09000026
CONSTITUENCY E14001300
COUNTY
LODGEMENT DATE 2019-02-19
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 60
ENVIRONMENT IMPACT POTENTIAL 83
ENERGY CONSUMPTION CURRENT 221
ENERGY CONSUMPTION POTENTIAL 77
CO2 EMISSIONS CURRENT 3.5
CO2 EMISS CURR PER FLOOR AREA 39
CO2 EMISSIONS POTENTIAL 1.2
LIGHTING COST CURRENT 93
LIGHTING COST POTENTIAL 64
HEATING COST CURRENT 570
HEATING COST POTENTIAL 391
HOT WATER COST CURRENT 107
HOT WATER COST POTENTIAL 73
TOTAL FLOOR AREA 89
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 90
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 55
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Mostly double glazing
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 75 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 55% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.75
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 44, Montreal Road
LOCAL AUTHORITY LABEL Redbridge
CONSTITUENCY LABEL Ilford North
POSTTOWN ILFORD
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2019-02-19 16:04:03
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 100022227877
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000007
Address display
Nation ew