Energy Performance Certificate

19, Park Field, Menston, LS29 6LP

EPC Report

Energy rating

Current: 59 D | Potential: 74 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 D Current: 59 D 74 C Potential: 74 C

Environmental impact (CO₂)

Current: 50 | Potential: 66
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 50 Current: 50 66 Potential: 66
Field Value
LMK KEY 0862-2856-7165-9221-1925
ADDRESS1 19, Park Field
ADDRESS2 Menston
ADDRESS3
POSTCODE LS29 6LP
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 59
POTENTIAL ENERGY EFFICIENCY 74
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2019-06-26
LOCAL AUTHORITY E08000032
CONSTITUENCY E14001472
COUNTY
LODGEMENT DATE 2019-06-26
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 50
ENVIRONMENT IMPACT POTENTIAL 66
ENERGY CONSUMPTION CURRENT 287
ENERGY CONSUMPTION POTENTIAL 197
CO2 EMISSIONS CURRENT 7.8
CO2 EMISS CURR PER FLOOR AREA 51
CO2 EMISSIONS POTENTIAL 5.4
LIGHTING COST CURRENT 156
LIGHTING COST POTENTIAL 89
HEATING COST CURRENT 1326
HEATING COST POTENTIAL 1086
HOT WATER COST CURRENT 95
HOT WATER COST POTENTIAL 95
TOTAL FLOOR AREA 153
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 90
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 7
NUMBER HEATED ROOMS 7
LOW ENERGY LIGHTING 24
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Mostly double glazing
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 24% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.44
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 19, Park Field, Menston
LOCAL AUTHORITY LABEL Bradford
CONSTITUENCY LABEL Shipley
POSTTOWN ILKLEY
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2019-06-26 17:10:50
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 21
LOW ENERGY FIXED LIGHT COUNT 5
UPRN 100051247643
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000003
Address display
Nation ew