Energy Performance Certificate

82, Castlebar Park, W5 1BU

EPC Report

Energy rating

Current: 67 D | Potential: 69 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 67 D Current: 67 D 69 C Potential: 69 C

Environmental impact (CO₂)

Current: 63 | Potential: 65
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 63 Current: 63 65 Potential: 65
Field Value
LMK KEY 0848-7004-7288-4166-4950
ADDRESS1 82, Castlebar Park
ADDRESS2
ADDRESS3
POSTCODE W5 1BU
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 67
POTENTIAL ENERGY EFFICIENCY 69
PROPERTY TYPE Flat
BUILT FORM Detached
INSPECTION DATE 2016-08-04
LOCAL AUTHORITY E09000009
CONSTITUENCY E14001208
COUNTY
LODGEMENT DATE 2016-08-04
TRANSACTION TYPE Non-marketed sale
ENVIRONMENT IMPACT CURRENT 63
ENVIRONMENT IMPACT POTENTIAL 65
ENERGY CONSUMPTION CURRENT 205
ENERGY CONSUMPTION POTENTIAL 190
CO2 EMISSIONS CURRENT 3.2
CO2 EMISS CURR PER FLOOR AREA 36
CO2 EMISSIONS POTENTIAL 3.0
LIGHTING COST CURRENT 114
LIGHTING COST POTENTIAL 63
HEATING COST CURRENT 537
HEATING COST POTENTIAL 525
HOT WATER COST CURRENT 117
HOT WATER COST POTENTIAL 117
TOTAL FLOOR AREA 88
ENERGY TARIFF Unknown
MAINS GAS FLAG Y
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 20
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, insulated (assumed)
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 20% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.45
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 82, Castlebar Park
LOCAL AUTHORITY LABEL Ealing
CONSTITUENCY LABEL Ealing North
POSTTOWN LONDON
CONSTRUCTION AGE BAND England and Wales: 1991-1995
LODGEMENT DATETIME 2016-08-04 09:34:50
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 20
LOW ENERGY FIXED LIGHT COUNT 4
UPRN 12076476
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000007
Address display
Nation ew