Energy Performance Certificate

8 Clover Field, CB9 9QE

EPC Report

Energy rating

Current: 68 D | Potential: 79 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 68 D Current: 68 D 79 C Potential: 79 C

Environmental impact (CO₂)

Current: 63 | Potential: 73
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 63 Current: 63 73 Potential: 73
Field Value
LMK KEY 0847-3035-7207-0584-5200
ADDRESS1 8 Clover Field
ADDRESS2
ADDRESS3
POSTCODE CB9 9QE
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 68
POTENTIAL ENERGY EFFICIENCY 79
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2024-03-04
LOCAL AUTHORITY E07000245
CONSTITUENCY E14001578
COUNTY
LODGEMENT DATE 2024-03-04
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 63
ENVIRONMENT IMPACT POTENTIAL 73
ENERGY CONSUMPTION CURRENT 210
ENERGY CONSUMPTION POTENTIAL 146
CO2 EMISSIONS CURRENT 4.7
CO2 EMISS CURR PER FLOOR AREA 37
CO2 EMISSIONS POTENTIAL 3.3
LIGHTING COST CURRENT 249
LIGHTING COST POTENTIAL 144
HEATING COST CURRENT 1369
HEATING COST POTENTIAL 1387
HOT WATER COST CURRENT 266
HOT WATER COST POTENTIAL 162
TOTAL FLOOR AREA 127
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 7
NUMBER HEATED ROOMS 7
LOW ENERGY LIGHTING 27
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, limited insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 27% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 1
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 8 Clover Field
LOCAL AUTHORITY LABEL West Suffolk
CONSTITUENCY LABEL West Suffolk
POSTTOWN HAVERHILL
CONSTRUCTION AGE BAND England and Wales: 1996-2002
LODGEMENT DATETIME 2024-03-04 21:18:42
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 15
LOW ENERGY FIXED LIGHT COUNT 4
UPRN 200001861051
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2024.csv
COUNTRY England
REGION E12000006
Address display
Nation ew