Energy Performance Certificate

11, Cator, Stoke Gabriel, TQ9 6FG

EPC Report

Energy rating

Current: 86 B | Potential: 86 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 86 B Current: 86 B 86 B Potential: 86 B

Environmental impact (CO₂)

Current: 86 | Potential: 86
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 86 Current: 86 86 Potential: 86
Field Value
LMK KEY 0838-2003-7336-0797-5984
ADDRESS1 11, Cator
ADDRESS2 Stoke Gabriel
ADDRESS3
POSTCODE TQ9 6FG
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING B
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 86
POTENTIAL ENERGY EFFICIENCY 86
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2013-06-07
LOCAL AUTHORITY E07000044
CONSTITUENCY E14001484
COUNTY
LODGEMENT DATE 2013-06-07
TRANSACTION TYPE New dwelling
ENVIRONMENT IMPACT CURRENT 86
ENVIRONMENT IMPACT POTENTIAL 86
ENERGY CONSUMPTION CURRENT 63
ENERGY CONSUMPTION POTENTIAL 63
CO2 EMISSIONS CURRENT 3.1
CO2 EMISS CURR PER FLOOR AREA 12
CO2 EMISSIONS POTENTIAL 3.1
LIGHTING COST CURRENT 100
LIGHTING COST POTENTIAL 100
HEATING COST CURRENT 552
HEATING COST POTENTIAL 552
HOT WATER COST CURRENT 56
HOT WATER COST POTENTIAL 56
TOTAL FLOOR AREA 258
ENERGY TARIFF standard tariff
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 3
MAIN HEATING CONTROLS Time and temperature zone control
MULTI GLAZE PROPORTION
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT
NUMBER HABITABLE ROOMS
NUMBER HEATED ROOMS
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system, plus solar
HOT WATER ENERGY EFF Very Good
HOT WATER ENV EFF Very Good
FLOOR DESCRIPTION Average thermal transmittance 0.20 W/m²K
FLOOR ENERGY EFF Very Good
FLOOR ENV EFF Very Good
WINDOWS DESCRIPTION High performance glazing
WINDOWS ENERGY EFF Very Good
WINDOWS ENV EFF Very Good
WALLS DESCRIPTION Average thermal transmittance 0.26 W/m²K
WALLS ENERGY EFF Very Good
WALLS ENV EFF Very Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Average thermal transmittance 0.18 W/m²K
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Time and temperature zone control
MAINHEATC ENERGY EFF Very Good
MAINHEATC ENV EFF Very Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL Gas: mains gas
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.35
PHOTO SUPPLY
SOLAR WATER HEATING FLAG
MECHANICAL VENTILATION
ADDRESS 11, Cator, Stoke Gabriel
LOCAL AUTHORITY LABEL South Hams
CONSTITUENCY LABEL South Devon
POSTTOWN TOTNES
CONSTRUCTION AGE BAND 2011
LODGEMENT DATETIME 2013-06-07 12:41:55
TENURE
FIXED LIGHTING OUTLETS COUNT 23
LOW ENERGY FIXED LIGHT COUNT 23
UPRN 10090533179
UPRN SOURCE Energy Assessor
REPORT TYPE 3
Source file certificates-2013.csv
COUNTRY England
REGION E12000009
Address display
Nation ew