Energy Performance Certificate

1 School Field, Bamber Bridge, PR5 8BJ

EPC Report

Energy rating

Current: 65 D | Potential: 74 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 65 D Current: 65 D 74 C Potential: 74 C

Environmental impact (CO₂)

Current: 66 | Potential: 72
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 66 Current: 66 72 Potential: 72
Field Value
LMK KEY 0830-3057-0209-5366-8204
ADDRESS1 1 School Field
ADDRESS2 Bamber Bridge
ADDRESS3
POSTCODE PR5 8BJ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 65
POTENTIAL ENERGY EFFICIENCY 74
PROPERTY TYPE Bungalow
BUILT FORM Detached
INSPECTION DATE 2026-01-07
LOCAL AUTHORITY E07000118
CONSTITUENCY E14001170
COUNTY
LODGEMENT DATE 2026-01-09
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 66
ENVIRONMENT IMPACT POTENTIAL 72
ENERGY CONSUMPTION CURRENT 213
ENERGY CONSUMPTION POTENTIAL 165
CO2 EMISSIONS CURRENT 3.1
CO2 EMISS CURR PER FLOOR AREA 38
CO2 EMISSIONS POTENTIAL 2.5
LIGHTING COST CURRENT 50
LIGHTING COST POTENTIAL 50
HEATING COST CURRENT 948
HEATING COST POTENTIAL 791
HOT WATER COST CURRENT 285
HOT WATER COST POTENTIAL 285
TOTAL FLOOR AREA 81
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 270 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Excellent lighting efficiency
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.36
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 1 School Field, Bamber Bridge
LOCAL AUTHORITY LABEL Chorley
CONSTITUENCY LABEL Chorley
POSTTOWN PRESTON
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2026-01-09 08:53:15
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 18
LOW ENERGY FIXED LIGHT COUNT 18
UPRN 100010394737
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2026.csv
COUNTRY England
REGION E12000002
Address display
Nation ew