Energy Performance Certificate

The Spinney, Mill Lane, Ellastone, DE6 2HF

EPC Report

Energy rating

Current: 58 D | Potential: 97 A
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 58 D Current: 58 D 97 A Potential: 97 A

Environmental impact (CO₂)

Current: 23 | Potential: 110
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 23 Current: 23 110 Potential: 110
Field Value
LMK KEY 0755-2882-7859-9128-6861
ADDRESS1 The Spinney
ADDRESS2 Mill Lane
ADDRESS3 Ellastone
POSTCODE DE6 2HF
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING A
CURRENT ENERGY EFFICIENCY 58
POTENTIAL ENERGY EFFICIENCY 97
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2018-05-22
LOCAL AUTHORITY E07000193
CONSTITUENCY E14001143
COUNTY
LODGEMENT DATE 2018-05-22
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 23
ENVIRONMENT IMPACT POTENTIAL 110
ENERGY CONSUMPTION CURRENT 272
ENERGY CONSUMPTION POTENTIAL 36
CO2 EMISSIONS CURRENT 13
CO2 EMISS CURR PER FLOOR AREA 103
CO2 EMISSIONS POTENTIAL -1.3
LIGHTING COST CURRENT 113
LIGHTING COST POTENTIAL 87
HEATING COST CURRENT 1174
HEATING COST POTENTIAL 770
HOT WATER COST CURRENT 199
HOT WATER COST POTENTIAL 94
TOTAL FLOOR AREA 126
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 70
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Very Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, anthracite
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Roof room(s), insulated (assumed)
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, anthracite
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 70% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL anthracite
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.28
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS The Spinney, Mill Lane, Ellastone
LOCAL AUTHORITY LABEL East Staffordshire
CONSTITUENCY LABEL Burton and Uttoxeter
POSTTOWN ASHBOURNE
CONSTRUCTION AGE BAND England and Wales: 1991-1995
LODGEMENT DATETIME 2018-05-22 15:55:07
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 10
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100031648278
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2018.csv
COUNTRY England
REGION E12000005
Address display
Nation ew