Energy Performance Certificate

22, Third Avenue, ME7 2HA

EPC Report

Energy rating

Current: 61 D | Potential: 90 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 61 D Current: 61 D 90 B Potential: 90 B

Environmental impact (CO₂)

Current: 56 | Potential: 91
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 56 Current: 56 91 Potential: 91
Field Value
LMK KEY 0734-2819-7399-9625-6855
ADDRESS1 22, Third Avenue
ADDRESS2
ADDRESS3
POSTCODE ME7 2HA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 61
POTENTIAL ENERGY EFFICIENCY 90
PROPERTY TYPE House
BUILT FORM Enclosed End-Terrace
INSPECTION DATE 2015-01-21
LOCAL AUTHORITY E06000035
CONSTITUENCY E14001246
COUNTY
LODGEMENT DATE 2015-01-21
TRANSACTION TYPE None of the above
ENVIRONMENT IMPACT CURRENT 56
ENVIRONMENT IMPACT POTENTIAL 91
ENERGY CONSUMPTION CURRENT 303
ENERGY CONSUMPTION POTENTIAL 42
CO2 EMISSIONS CURRENT 3.3
CO2 EMISS CURR PER FLOOR AREA 53
CO2 EMISSIONS POTENTIAL 0.5
LIGHTING COST CURRENT 52
LIGHTING COST POTENTIAL 52
HEATING COST CURRENT 486
HEATING COST POTENTIAL 304
HOT WATER COST CURRENT 230
HOT WATER COST POTENTIAL 67
TOTAL FLOOR AREA 62
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 75
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 75 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 75% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.43
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 22, Third Avenue
LOCAL AUTHORITY LABEL Medway
CONSTITUENCY LABEL Gillingham and Rainham
POSTTOWN GILLINGHAM
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2015-01-21 16:54:06
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 8
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 44077254
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000008
Address display
Nation ew