Energy Performance Certificate

10, Bercham, Two Mile Ash, MK8 8HX

EPC Report

Energy rating

Current: 61 D | Potential: 95 A
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 61 D Current: 61 D 95 A Potential: 95 A

Environmental impact (CO₂)

Current: 48 | Potential: 81
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 48 Current: 48 81 Potential: 81
Field Value
LMK KEY 0718-4919-6260-5101-9960
ADDRESS1 10, Bercham
ADDRESS2 Two Mile Ash
ADDRESS3
POSTCODE MK8 8HX
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING A
CURRENT ENERGY EFFICIENCY 61
POTENTIAL ENERGY EFFICIENCY 95
PROPERTY TYPE House
BUILT FORM Enclosed End-Terrace
INSPECTION DATE 2019-10-09
LOCAL AUTHORITY E06000042
CONSTITUENCY E14001370
COUNTY
LODGEMENT DATE 2019-10-10
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 48
ENVIRONMENT IMPACT POTENTIAL 81
ENERGY CONSUMPTION CURRENT 472
ENERGY CONSUMPTION POTENTIAL 159
CO2 EMISSIONS CURRENT 3.3
CO2 EMISS CURR PER FLOOR AREA 80
CO2 EMISSIONS POTENTIAL 1.1
LIGHTING COST CURRENT 69
LIGHTING COST POTENTIAL 39
HEATING COST CURRENT 457
HEATING COST POTENTIAL 286
HOT WATER COST CURRENT 242
HOT WATER COST POTENTIAL 85
TOTAL FLOOR AREA 42
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 2
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 20
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Timber frame, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 75 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 20% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.39
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 10, Bercham, Two Mile Ash
LOCAL AUTHORITY LABEL Milton Keynes
CONSTITUENCY LABEL Milton Keynes North
POSTTOWN MILTON KEYNES
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2019-10-10 11:40:04
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 5
LOW ENERGY FIXED LIGHT COUNT 1
UPRN 25013685
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000008
Address display
Nation ew