Energy Performance Certificate

77, Barley Field, Bamber Bridge, PR5 8JJ

EPC Report

Energy rating

Current: 43 E | Potential: 91 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 43 E Current: 43 E 91 B Potential: 91 B

Environmental impact (CO₂)

Current: 50 | Potential: 75
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 50 Current: 50 75 Potential: 75
Field Value
LMK KEY 0649-2865-6319-9228-0141
ADDRESS1 77, Barley Field
ADDRESS2 Bamber Bridge
ADDRESS3
POSTCODE PR5 8JJ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 43
POTENTIAL ENERGY EFFICIENCY 91
PROPERTY TYPE House
BUILT FORM Enclosed End-Terrace
INSPECTION DATE 2018-09-25
LOCAL AUTHORITY E07000118
CONSTITUENCY E14001170
COUNTY
LODGEMENT DATE 2018-09-25
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 50
ENVIRONMENT IMPACT POTENTIAL 75
ENERGY CONSUMPTION CURRENT 410
ENERGY CONSUMPTION POTENTIAL 196
CO2 EMISSIONS CURRENT 3.5
CO2 EMISS CURR PER FLOOR AREA 69
CO2 EMISSIONS POTENTIAL 1.7
LIGHTING COST CURRENT 58
LIGHTING COST POTENTIAL 42
HEATING COST CURRENT 746
HEATING COST POTENTIAL 333
HOT WATER COST CURRENT 302
HOT WATER COST POTENTIAL 87
TOTAL FLOOR AREA 50
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Appliance thermostats
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 2
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 50
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, partial insulation (assumed)
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 150 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Room heaters, electric
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION Appliance thermostats
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 50% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.36
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 77, Barley Field, Bamber Bridge
LOCAL AUTHORITY LABEL Chorley
CONSTITUENCY LABEL Chorley
POSTTOWN PRESTON
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2018-09-25 14:37:25
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 6
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 100010391544
UPRN SOURCE Address Matched
REPORT TYPE 2
Source file certificates-2018.csv
COUNTRY England
REGION E12000002
Address display
Nation ew