Energy Performance Certificate

77, Barley Field, Bamber Bridge, PR5 8JJ

EPC Report

Energy rating

Current: 44 E | Potential: 88 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 44 E Current: 44 E 88 B Potential: 88 B

Environmental impact (CO₂)

Current: 50 | Potential: 70
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 50 Current: 50 70 Potential: 70
Field Value
LMK KEY 0649-2861-6389-9291-7155
ADDRESS1 77, Barley Field
ADDRESS2 Bamber Bridge
ADDRESS3
POSTCODE PR5 8JJ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 44
POTENTIAL ENERGY EFFICIENCY 88
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2019-08-19
LOCAL AUTHORITY E07000118
CONSTITUENCY E14001170
COUNTY
LODGEMENT DATE 2019-08-20
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 50
ENVIRONMENT IMPACT POTENTIAL 70
ENERGY CONSUMPTION CURRENT 374
ENERGY CONSUMPTION POTENTIAL 221
CO2 EMISSIONS CURRENT 3.8
CO2 EMISS CURR PER FLOOR AREA 63
CO2 EMISSIONS POTENTIAL 2.3
LIGHTING COST CURRENT 48
LIGHTING COST POTENTIAL 54
HEATING COST CURRENT 909
HEATING COST POTENTIAL 458
HOT WATER COST CURRENT 342
HOT WATER COST POTENTIAL 100
TOTAL FLOOR AREA 61
ENERGY TARIFF Unknown
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Appliance thermostats
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Timber frame, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 75 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Room heaters, electric
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION Appliance thermostats
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.46
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 77, Barley Field, Bamber Bridge
LOCAL AUTHORITY LABEL Chorley
CONSTITUENCY LABEL Chorley
POSTTOWN PRESTON
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2019-08-20 16:58:34
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 5
LOW ENERGY FIXED LIGHT COUNT 5
UPRN 100010391544
UPRN SOURCE Address Matched
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000002
Address display
Nation ew