Energy Performance Certificate

6, Monkwray Brow, CA28 9DT

EPC Report

Energy rating

Current: 52 E | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 52 E Current: 52 E 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 46 | Potential: 78
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 46 Current: 46 78 Potential: 78
Field Value
LMK KEY 0640-2834-7572-9296-5511
ADDRESS1 6, Monkwray Brow
ADDRESS2
ADDRESS3
POSTCODE CA28 9DT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 52
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE Bungalow
BUILT FORM Detached
INSPECTION DATE 2016-03-14
LOCAL AUTHORITY E06000063
CONSTITUENCY E14001583
COUNTY
LODGEMENT DATE 2016-03-15
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 46
ENVIRONMENT IMPACT POTENTIAL 78
ENERGY CONSUMPTION CURRENT 375
ENERGY CONSUMPTION POTENTIAL 133
CO2 EMISSIONS CURRENT 5.1
CO2 EMISS CURR PER FLOOR AREA 66
CO2 EMISSIONS POTENTIAL 1.9
LIGHTING COST CURRENT 104
LIGHTING COST POTENTIAL 52
HEATING COST CURRENT 791
HEATING COST POTENTIAL 561
HOT WATER COST CURRENT 266
HOT WATER COST POTENTIAL 74
TOTAL FLOOR AREA 78
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 0
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION No low energy lighting
LIGHTING ENERGY EFF Very Poor
LIGHTING ENV EFF Very Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.47
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 6, Monkwray Brow
LOCAL AUTHORITY LABEL Cumberland
CONSTITUENCY LABEL Whitehaven and Workington
POSTTOWN WHITEHAVEN
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2016-03-15 15:22:53
TENURE unknown
FIXED LIGHTING OUTLETS COUNT 8
LOW ENERGY FIXED LIGHT COUNT 0
UPRN 100110319536
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000002
Address display
Nation ew