Energy Performance Certificate

36 POPLAR STREET, BIRKBY, HUDDERSFIELD, HD2 2PA

EPC Report

Energy rating

Current: 55 D | Potential: 88 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 55 D Current: 55 D 88 B Potential: 88 B

Environmental impact (CO₂)

Current: 53 | Potential: 90
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 53 Current: 53 90 Potential: 90
Field Value
LMK KEY 0639-7329-3000-0216-3222
ADDRESS1 36 POPLAR STREET
ADDRESS2 BIRKBY
ADDRESS3 HUDDERSFIELD
POSTCODE HD2 2PA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 55
POTENTIAL ENERGY EFFICIENCY 88
PROPERTY TYPE House
BUILT FORM Enclosed Mid-Terrace
INSPECTION DATE 2021-01-26
LOCAL AUTHORITY E08000034
CONSTITUENCY E14001297
COUNTY
LODGEMENT DATE 2021-01-26
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 53
ENVIRONMENT IMPACT POTENTIAL 90
ENERGY CONSUMPTION CURRENT 359
ENERGY CONSUMPTION POTENTIAL 75
CO2 EMISSIONS CURRENT 3.7
CO2 EMISS CURR PER FLOOR AREA 63
CO2 EMISSIONS POTENTIAL 0.8
LIGHTING COST CURRENT 50
LIGHTING COST POTENTIAL 50
HEATING COST CURRENT 775
HEATING COST POTENTIAL 375
HOT WATER COST CURRENT 77
HOT WATER COST POTENTIAL 53
TOTAL FLOOR AREA 59
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Room thermostat only
MULTI GLAZE PROPORTION 90
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION To unheated space, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Mostly double glazing
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Sandstone or limestone, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Room thermostat only
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.84
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 36 POPLAR STREET, BIRKBY, HUDDERSFIELD
LOCAL AUTHORITY LABEL Kirklees
CONSTITUENCY LABEL Huddersfield
POSTTOWN HUDDERSFIELD
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2021-01-26 11:59:36
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 83062044
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY England
REGION E12000003
Address display
Nation ew