Energy Performance Certificate

23, Markham Avenue, Carcroft, DN6 8DT

EPC Report

Energy rating

Current: 39 E | Potential: 81 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 39 E Current: 39 E 81 B Potential: 81 B

Environmental impact (CO₂)

Current: 32 | Potential: 77
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 32 Current: 32 77 Potential: 77
Field Value
LMK KEY 0615-2883-7756-9725-9585
ADDRESS1 23, Markham Avenue
ADDRESS2 Carcroft
ADDRESS3
POSTCODE DN6 8DT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 39
POTENTIAL ENERGY EFFICIENCY 81
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2015-05-27
LOCAL AUTHORITY E08000017
CONSTITUENCY E14001200
COUNTY
LODGEMENT DATE 2015-05-28
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 32
ENVIRONMENT IMPACT POTENTIAL 77
ENERGY CONSUMPTION CURRENT 476
ENERGY CONSUMPTION POTENTIAL 135
CO2 EMISSIONS CURRENT 8.1
CO2 EMISS CURR PER FLOOR AREA 84
CO2 EMISSIONS POTENTIAL 2.3
LIGHTING COST CURRENT 92
LIGHTING COST POTENTIAL 59
HEATING COST CURRENT 1434
HEATING COST POTENTIAL 626
HOT WATER COST CURRENT 196
HOT WATER COST POTENTIAL 77
TOTAL FLOOR AREA 97
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 90
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 44
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Mostly double glazing
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 44% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.78
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 23, Markham Avenue, Carcroft
LOCAL AUTHORITY LABEL Doncaster
CONSTITUENCY LABEL Doncaster North
POSTTOWN DONCASTER
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2015-05-28 07:47:44
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 4
UPRN 100050749446
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000003
Address display
Nation ew