Energy Performance Certificate

23, Banktop Place, Emerson Valley, MK4 2ER

EPC Report

Energy rating

Current: 46 E | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 46 E Current: 46 E 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 39 | Potential: 82
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 39 Current: 39 82 Potential: 82
Field Value
LMK KEY 0599-2844-6796-9406-4591
ADDRESS1 23, Banktop Place
ADDRESS2 Emerson Valley
ADDRESS3
POSTCODE MK4 2ER
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 46
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2016-01-04
LOCAL AUTHORITY E06000042
CONSTITUENCY E14001369
COUNTY
LODGEMENT DATE 2016-01-07
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 39
ENVIRONMENT IMPACT POTENTIAL 82
ENERGY CONSUMPTION CURRENT 449
ENERGY CONSUMPTION POTENTIAL 109
CO2 EMISSIONS CURRENT 5.6
CO2 EMISS CURR PER FLOOR AREA 79
CO2 EMISSIONS POTENTIAL 1.4
LIGHTING COST CURRENT 48
LIGHTING COST POTENTIAL 48
HEATING COST CURRENT 915
HEATING COST POTENTIAL 468
HOT WATER COST CURRENT 256
HOT WATER COST POTENTIAL 71
TOTAL FLOOR AREA 70
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 150 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.35
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 23, Banktop Place, Emerson Valley
LOCAL AUTHORITY LABEL Milton Keynes
CONSTITUENCY LABEL Milton Keynes Central
POSTTOWN MILTON KEYNES
CONSTRUCTION AGE BAND England and Wales: 1991-1995
LODGEMENT DATETIME 2016-01-07 10:07:04
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 10
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 25030445
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000008
Address display
Nation ew