Energy Performance Certificate

36, Abbey Road, Enderby, LE19 2DA

EPC Report

Energy rating

Current: 59 D | Potential: 85 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 D Current: 59 D 85 B Potential: 85 B

Environmental impact (CO₂)

Current: 55 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 55 Current: 55 85 Potential: 85
Field Value
LMK KEY 0594-2874-6449-9202-9395
ADDRESS1 36, Abbey Road
ADDRESS2 Enderby
ADDRESS3
POSTCODE LE19 2DA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 59
POTENTIAL ENERGY EFFICIENCY 85
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2012-04-04
LOCAL AUTHORITY E07000129
CONSTITUENCY E14001488
COUNTY
LODGEMENT DATE 2012-06-15
TRANSACTION TYPE marketed sale
ENVIRONMENT IMPACT CURRENT 55
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 258
ENERGY CONSUMPTION POTENTIAL 82
CO2 EMISSIONS CURRENT 4.2
CO2 EMISS CURR PER FLOOR AREA 50
CO2 EMISSIONS POTENTIAL 1.4
LIGHTING COST CURRENT 61
LIGHTING COST POTENTIAL 61
HEATING COST CURRENT 717
HEATING COST POTENTIAL 415
HOT WATER COST CURRENT 81
HOT WATER COST POTENTIAL 60
TOTAL FLOOR AREA 84
ENERGY TARIFF dual
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 78
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Very Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 78% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.34
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 36, Abbey Road, Enderby
LOCAL AUTHORITY LABEL Blaby
CONSTITUENCY LABEL South Leicestershire
POSTTOWN LEICESTER
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2012-06-15 09:37:28
TENURE
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100030377918
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2012.csv
COUNTRY England
REGION E12000004
Address display
Nation ew