Energy Performance Certificate

43, Carr Field, Bamber Bridge, PR5 8BT

EPC Report

Energy rating

Current: 62 D | Potential: 85 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 62 D Current: 62 D 85 B Potential: 85 B

Environmental impact (CO₂)

Current: 59 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 Current: 59 85 Potential: 85
Field Value
LMK KEY 0571-2829-6787-2820-5491
ADDRESS1 43, Carr Field
ADDRESS2 Bamber Bridge
ADDRESS3
POSTCODE PR5 8BT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 62
POTENTIAL ENERGY EFFICIENCY 85
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2020-08-21
LOCAL AUTHORITY E07000118
CONSTITUENCY E14001170
COUNTY
LODGEMENT DATE 2020-08-25
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 59
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 270
ENERGY CONSUMPTION POTENTIAL 92
CO2 EMISSIONS CURRENT 3.4
CO2 EMISS CURR PER FLOOR AREA 47
CO2 EMISSIONS POTENTIAL 1.2
LIGHTING COST CURRENT 67
LIGHTING COST POTENTIAL 67
HEATING COST CURRENT 595
HEATING COST POTENTIAL 432
HOT WATER COST CURRENT 164
HOT WATER COST POTENTIAL 70
TOTAL FLOOR AREA 73
ENERGY TARIFF Unknown
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 89
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 270 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 89% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.34
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 43, Carr Field, Bamber Bridge
LOCAL AUTHORITY LABEL Chorley
CONSTITUENCY LABEL Chorley
POSTTOWN PRESTON
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2020-08-25 12:28:32
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 8
UPRN 100010392096
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2020.csv
COUNTRY England
REGION E12000002
Address display
Nation ew