Energy Performance Certificate

73, High Street, Haddenham, CB6 3XB

EPC Report

Energy rating

Current: 13 G | Potential: 76 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 13 G Current: 13 G 76 C Potential: 76 C

Environmental impact (CO₂)

Current: 6 | Potential: 54
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 6 Current: 6 54 Potential: 54
Field Value
LMK KEY 0461-2836-6431-9103-9051
ADDRESS1 73, High Street
ADDRESS2 Haddenham
ADDRESS3
POSTCODE CB6 3XB
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING G
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 13
POTENTIAL ENERGY EFFICIENCY 76
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2017-07-06
LOCAL AUTHORITY E07000009
CONSTITUENCY E14001224
COUNTY
LODGEMENT DATE 2017-08-09
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 6
ENVIRONMENT IMPACT POTENTIAL 54
ENERGY CONSUMPTION CURRENT 1001
ENERGY CONSUMPTION POTENTIAL 287
CO2 EMISSIONS CURRENT 16
CO2 EMISS CURR PER FLOOR AREA 147
CO2 EMISSIONS POTENTIAL 4.9
LIGHTING COST CURRENT 76
LIGHTING COST POTENTIAL 76
HEATING COST CURRENT 2762
HEATING COST POTENTIAL 842
HOT WATER COST CURRENT 275
HOT WATER COST POTENTIAL 97
TOTAL FLOOR AREA 112
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, wood logs
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.55
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 73, High Street, Haddenham
LOCAL AUTHORITY LABEL East Cambridgeshire
CONSTITUENCY LABEL Ely and East Cambridgeshire
POSTTOWN ELY
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2017-08-09 10:30:55
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 10
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 100090046843
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2017.csv
COUNTRY England
REGION E12000006
Address display
Nation ew