Energy Performance Certificate

22, Mount Pleasant, Quarry Bank, DY5 2YZ

EPC Report

Energy rating

Current: 50 E | Potential: 86 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 50 E Current: 50 E 86 B Potential: 86 B

Environmental impact (CO₂)

Current: 43 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 43 Current: 43 85 Potential: 85
Field Value
LMK KEY 0434-2875-7331-9595-6921
ADDRESS1 22, Mount Pleasant
ADDRESS2 Quarry Bank
ADDRESS3
POSTCODE DY5 2YZ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 50
POTENTIAL ENERGY EFFICIENCY 86
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2015-07-15
LOCAL AUTHORITY E08000027
CONSTITUENCY E14001524
COUNTY
LODGEMENT DATE 2015-07-16
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 43
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 383
ENERGY CONSUMPTION POTENTIAL 92
CO2 EMISSIONS CURRENT 5.5
CO2 EMISS CURR PER FLOOR AREA 68
CO2 EMISSIONS POTENTIAL 1.4
LIGHTING COST CURRENT 88
LIGHTING COST POTENTIAL 53
HEATING COST CURRENT 1003
HEATING COST POTENTIAL 450
HOT WATER COST CURRENT 134
HOT WATER COST POTENTIAL 71
TOTAL FLOOR AREA 82
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 33
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 33% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.59
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 22, Mount Pleasant, Quarry Bank
LOCAL AUTHORITY LABEL Dudley
CONSTITUENCY LABEL Stourbridge
POSTTOWN BRIERLEY HILL
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2015-07-16 10:24:11
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 90107855
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000005
Address display
Nation ew