Energy Performance Certificate

15 Deacon Road, BH11 9ER

EPC Report

Energy rating

Current: 49 E | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 49 E Current: 49 E 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 34 | Potential: 64
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 34 Current: 34 64 Potential: 64
Field Value
LMK KEY 0390-2167-7440-2525-8941
ADDRESS1 15 Deacon Road
ADDRESS2
ADDRESS3
POSTCODE BH11 9ER
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 49
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2025-04-23
LOCAL AUTHORITY E06000058
CONSTITUENCY E14001116
COUNTY
LODGEMENT DATE 2025-04-23
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 34
ENVIRONMENT IMPACT POTENTIAL 64
ENERGY CONSUMPTION CURRENT 491
ENERGY CONSUMPTION POTENTIAL 210
CO2 EMISSIONS CURRENT 5.4
CO2 EMISS CURR PER FLOOR AREA 83
CO2 EMISSIONS POTENTIAL 2.3
LIGHTING COST CURRENT 116
LIGHTING COST POTENTIAL 80
HEATING COST CURRENT 1191
HEATING COST POTENTIAL 727
HOT WATER COST CURRENT 442
HOT WATER COST POTENTIAL 147
TOTAL FLOOR AREA 65
ENERGY TARIFF Unknown
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 56
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 50 mm loft insulation
ROOF ENERGY EFF Poor
ROOF ENV EFF Poor
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 56% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.35
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 15 Deacon Road
LOCAL AUTHORITY LABEL Bournemouth, Christchurch and Poole
CONSTITUENCY LABEL Bournemouth West
POSTTOWN BOURNEMOUTH
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2025-04-23 12:26:57
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 5
UPRN 100040730735
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY England
REGION E12000009
Address display
Nation ew