Energy Performance Certificate

1 Third Street, Blackhall Colliery, TS27 4EW

EPC Report

Energy rating

Current: 62 D | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 62 D Current: 62 D 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 56 | Potential: 82
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 56 Current: 56 82 Potential: 82
Field Value
LMK KEY 0359-3018-8209-3214-7204
ADDRESS1 1 Third Street
ADDRESS2 Blackhall Colliery
ADDRESS3
POSTCODE TS27 4EW
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 62
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2024-01-05
LOCAL AUTHORITY E06000047
CONSTITUENCY E14001211
COUNTY
LODGEMENT DATE 2024-01-06
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 56
ENVIRONMENT IMPACT POTENTIAL 82
ENERGY CONSUMPTION CURRENT 310
ENERGY CONSUMPTION POTENTIAL 129
CO2 EMISSIONS CURRENT 4.3
CO2 EMISS CURR PER FLOOR AREA 55
CO2 EMISSIONS POTENTIAL 1.8
LIGHTING COST CURRENT 125
LIGHTING COST POTENTIAL 125
HEATING COST CURRENT 1840
HEATING COST POTENTIAL 1184
HOT WATER COST CURRENT 230
HOT WATER COST POTENTIAL 153
TOTAL FLOOR AREA 78
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, insulated at rafters
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.3
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 1 Third Street, Blackhall Colliery
LOCAL AUTHORITY LABEL County Durham
CONSTITUENCY LABEL Easington
POSTTOWN HARTLEPOOL
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2024-01-06 11:24:59
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 9
UPRN 100110440437
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2024.csv
COUNTRY England
REGION E12000001
Address display
Nation ew