Energy Performance Certificate

10 Cedar Court, 31-37, Collingdon Street, LU1 1RT

EPC Report

Energy rating

Current: 78 C | Potential: 78 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 78 C Current: 78 C 78 C Potential: 78 C

Environmental impact (CO₂)

Current: 81 | Potential: 81
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 81 Current: 81 81 Potential: 81
Field Value
LMK KEY 0342-2845-7643-9296-3235
ADDRESS1 10 Cedar Court
ADDRESS2 31-37, Collingdon Street
ADDRESS3
POSTCODE LU1 1RT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 78
POTENTIAL ENERGY EFFICIENCY 78
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2016-04-15
LOCAL AUTHORITY E06000032
CONSTITUENCY E14001346
COUNTY
LODGEMENT DATE 2016-04-25
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 81
ENVIRONMENT IMPACT POTENTIAL 81
ENERGY CONSUMPTION CURRENT 186
ENERGY CONSUMPTION POTENTIAL 186
CO2 EMISSIONS CURRENT 1.1
CO2 EMISS CURR PER FLOOR AREA 33
CO2 EMISSIONS POTENTIAL 1.1
LIGHTING COST CURRENT 25
LIGHTING COST POTENTIAL 25
HEATING COST CURRENT 184
HEATING COST POTENTIAL 184
HOT WATER COST CURRENT 98
HOT WATER COST POTENTIAL 98
TOTAL FLOOR AREA 32
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Charging system linked to use of community heating, room thermostat only
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Community scheme
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Solid brick, with external insulation
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Community scheme
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Charging system linked to use of community heating, room thermostat only
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 3
FLOOR HEIGHT 2.44
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 10 Cedar Court, 31-37, Collingdon Street
LOCAL AUTHORITY LABEL Luton
CONSTITUENCY LABEL Luton South and South Bedfordshire
POSTTOWN LUTON
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2016-04-25 13:45:09
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 6
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 10024036275
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000006
Address display
Nation ew