Energy Performance Certificate

Flat 6, 2 Woodland Road, S8 8PD

EPC Report

Energy rating

Current: 74 C | Potential: 76 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 74 C Current: 74 C 76 C Potential: 76 C

Environmental impact (CO₂)

Current: 77 | Potential: 80
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 77 Current: 77 80 Potential: 80
Field Value
LMK KEY 0310-2292-6370-2124-7601
ADDRESS1 Flat 6
ADDRESS2 2 Woodland Road
ADDRESS3
POSTCODE S8 8PD
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 74
POTENTIAL ENERGY EFFICIENCY 76
PROPERTY TYPE Flat
BUILT FORM Enclosed Mid-Terrace
INSPECTION DATE 2024-03-22
LOCAL AUTHORITY E08000039
CONSTITUENCY E14001469
COUNTY
LODGEMENT DATE 2024-03-22
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 77
ENVIRONMENT IMPACT POTENTIAL 80
ENERGY CONSUMPTION CURRENT 225
ENERGY CONSUMPTION POTENTIAL 191
CO2 EMISSIONS CURRENT 1.4
CO2 EMISS CURR PER FLOOR AREA 40
CO2 EMISSIONS POTENTIAL 1.2
LIGHTING COST CURRENT 55
LIGHTING COST POTENTIAL 55
HEATING COST CURRENT 464
HEATING COST POTENTIAL 386
HOT WATER COST CURRENT 134
HOT WATER COST POTENTIAL 135
TOTAL FLOOR AREA 36
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL 1
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 2
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 5.63
FLOOR HEIGHT 2.32
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Flat 6, 2 Woodland Road
LOCAL AUTHORITY LABEL Sheffield
CONSTITUENCY LABEL Sheffield Heeley
POSTTOWN SHEFFIELD
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2024-03-22 12:14:05
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 3
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 100052118551
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2024.csv
COUNTRY England
REGION E12000003
Address display
Nation ew