Energy Performance Certificate

5 Boltons Croft, Salwick, PR4 0SB

EPC Report

Energy rating

Current: 60 D | Potential: 74 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 60 D Current: 60 D 74 C Potential: 74 C

Environmental impact (CO₂)

Current: 48 | Potential: 61
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 48 Current: 48 61 Potential: 61
Field Value
LMK KEY 0300-2535-1310-2297-5065
ADDRESS1 5 Boltons Croft
ADDRESS2 Salwick
ADDRESS3
POSTCODE PR4 0SB
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 60
POTENTIAL ENERGY EFFICIENCY 74
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2023-09-15
LOCAL AUTHORITY E07000119
CONSTITUENCY E14001242
COUNTY
LODGEMENT DATE 2023-09-15
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 48
ENVIRONMENT IMPACT POTENTIAL 61
ENERGY CONSUMPTION CURRENT 200
ENERGY CONSUMPTION POTENTIAL 124
CO2 EMISSIONS CURRENT 5.8
CO2 EMISS CURR PER FLOOR AREA 56
CO2 EMISSIONS POTENTIAL 4.1
LIGHTING COST CURRENT 183
LIGHTING COST POTENTIAL 183
HEATING COST CURRENT 1129
HEATING COST POTENTIAL 1051
HOT WATER COST CURRENT 257
HOT WATER COST POTENTIAL 166
TOTAL FLOOR AREA 104
ENERGY TARIFF Unknown
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 6
LOW ENERGY LIGHTING 82
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, coal
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 270 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, oil
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 82% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL oil (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.45
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 5 Boltons Croft, Salwick
LOCAL AUTHORITY LABEL Fylde
CONSTITUENCY LABEL Fylde
POSTTOWN PRESTON
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2023-09-15 08:59:09
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 9
UPRN 10013594796
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2023.csv
COUNTRY England
REGION E12000002
Address display
Nation ew